FIBER TO THE PREMISES · HYDERABAD

FTTH infrastructure built for the next connection.

From field rollout to the final termination in a flat or villa, we design and execute fiber networks for operators, builders and communities.

Discuss an FTTH rollout ↗
Illustrative residential development for FTTH infrastructure
Illustrative image

OUR APPROACH

From the field to the customer premises

CyberFTTHMart handles FTTH planning and execution on behalf of service providers and property developers. Our work includes network pathways, underground or in-building cabling, fiber distribution, splicing, termination, testing and commissioning. We plan for future capacity so a site can grow without rebuilding its backbone.

Who we work with

LCOs, MSOs, ISPs, apartment developers, villa projects and commercial properties.

01

Network design

Route planning, distribution topology, splitter placement and capacity planning for new developments or upgrades.

02

Field & building installation

Fiber pathways, cabling, distribution enclosures, shafts and customer connection points.

03

Splicing & testing

Jointing, termination and verification before handover, with ongoing maintenance for systems we install.

RELEVANT EXPERIENCE

Designed for real-world deployment.

Our team has delivered more than 150 FTTH projects for operators and service providers, with approximately 120,000 connections of network capacity built across those assignments. Selected areas included migrations from coaxial infrastructure to FTTH.

See our project experience ↗

Ready to plan your site?

Tell us your location and requirements. We can discuss scope, equipment and next steps.

Message on WhatsApp ↗Email your plans ↗

PROJECT DEFINITION

What a project scope should make clear

An FTTH deployment depends on the operator’s service architecture and the building’s actual routes. A proposal should identify responsibility at every handoff, from upstream feed to customer outlet.

Agree before work starts

  • Subscriber and spare-capacity targets, agreed PON architecture and longest customer paths.
  • Feeder, riser, distribution and drop routes; splitter and enclosure locations.
  • Equipment models and optical limits supplied or approved by the operator.
  • Acceptance test method, labeling, as-built plan and responsibility for activation.

Verify before handover

  • Verify that each intended connection point matches its drawing and label.
  • Check the optical budget against the selected active and passive components.
  • Record test results at agreed points and resolve failed links before handover.

Common questions

Can a coaxial network be upgraded in one step?

The sequence depends on routes, access and the operator’s migration plan. Survey the usable pathways and phase customer changeovers with the operator.

Do you provide internet subscriptions?

No. We execute network infrastructure for the client operator; commercial subscriptions and provisioning remain with that operator.